From backup priorities to a complete proposal
- 01
Choose your priorities
List the systems you want to support during an outage.
- 02
Plan the property
Coordinate location, fuel supply and transfer equipment.
- 03
Agree on the handover
Confirm installation, testing, maintenance and support responsibilities.
Planning overview. Exact equipment and installation requirements depend on the property and selected model.
Start with the right property records
Hyannis, Cotuit, Osterville and Marstons Mills are within the Town of Barnstable. Use the town Building Division as the starting point for permit questions, even when the mailing address uses a village name. Its forms library includes electrical, gas and owner-authorization resources.
Gather available site plans and prior generator records. Ask the project team which documents and departmental reviews apply to the proposed equipment and its location. An earlier approval for another improvement does not establish the scope of this project.
Decide what the backup system must support
Make a short priority list: heating equipment, refrigeration, essential lighting, communications and any household pumps. If a guesthouse, detached garage or separate meter is involved, identify it before discussing equipment. Ask the electrician to document which circuits are included and how proposed future loads would affect the design.
Review the outdoor location and fuel together
Photographs of candidate locations should show the surrounding yard, building openings and existing equipment. Generac directs owners to the installation guide for the exact model’s requirements. Have the installer review placement before landscaping or purchasing screening.
Provide the current fuel supplier and available tank or meter information. Ask who will evaluate the supply, price any fuel work and coordinate that work with the electrical installation.
Prepare for a useful estimate
Send the address, building list, priorities and photographs taken safely from accessible areas. Request a written scope covering equipment, transfer arrangements, site work, permits, commissioning and exclusions. If you will be away at completion, nominate a person who can attend the handover and retain the documentation.
Common questions
Is Hyannis handled by a separate town permit office?
Hyannis is a village within Barnstable. Start with Barnstable’s Building Division and give the full property address.
Can one quote include a house and guesthouse?
Ask for both buildings to be assessed. Their services, circuits and ownership arrangements need to be understood before coverage is proposed.
Should I choose a generator by house size?
Bring appliance and circuit priorities to the assessment. Floor area alone does not describe what you want to keep operating.
Continue planning
Let’s plan your backup power
Tell us your town, the equipment you want to support and whether you already have a generator. We’ll confirm project scope and availability with you.
Manufacturer and local resources
Planning information checked against these sources on November 23, 2026. Confirm current model details, requirements and project scope before buying equipment.
Generac and its logo are trademarks of Generac Power Systems, Inc. Brand names and artwork identify the equipment discussed. J. Hall Electric is independent; no authorized-dealer status, warranty-service authorization or manufacturer endorsement is claimed. Image and logo credits.

