From backup priorities to a complete proposal
- 01
Choose your priorities
List the systems you want to support during an outage.
- 02
Plan the property
Coordinate location, fuel supply and transfer equipment.
- 03
Agree on the handover
Confirm installation, testing, maintenance and support responsibilities.
Planning overview. Exact equipment and installation requirements depend on the property and selected model.
Bring historic questions into the first discussion
Brewster’s Old King’s Highway Historic District Committee reviews exterior changes, structures and fences within its remit. Its published guidance considers site design and layout as well as materials and appearance. Ask whether the address and proposed generator, tank or screening need committee review.
Use a site sketch showing the whole arrangement. A fence that looks suitable in isolation may affect the equipment layout; a proposed change should be reviewed by the relevant professionals before it becomes part of the estimate.
Keep screening compatible with safe operation
Generac’s siting guidance discusses restricted airflow around fences, courtyards and vegetation. Have the installer evaluate the exact unit and surroundings before committing to a concealment plan.
Include nearby windows, outdoor seating, existing mechanical equipment and the access needed for service in the conversation. Ask how the proposed location addresses your household’s use of the garden and neighboring properties without promising that operation will be inaudible.
Separate application and inspection responsibilities
Brewster’s Building Department administers building and trade permits and serves as the town’s floodplain administrator. It also publishes a separate process for inspection requests; submitting an online application does not complete those arrangements.
Ask who is responsible for each applicable review and inspection. If site drainage or mapped flood conditions may affect the location, raise that question with the department before equipment is ordered.
Prepare the project information
Include the East Brewster, West Brewster or other street address, available plans, fuel-supplier information and photographs of candidate locations. List essential equipment and planned upgrades. Request a proposal that identifies site work, fuel work, electrical work, approvals and the handover, with unresolved choices clearly recorded.
Common questions
Can I hide the generator behind new fencing?
Discuss the fence and generator together with the installer and, where applicable, the historic committee. Appearance and operating requirements both need to be addressed.
Does every Brewster property need the same approvals?
No universal approval list is established here. The address, location and proposed work determine which questions the town needs to resolve.
Who should arrange the inspections?
Have the proposal identify the responsible permit holders and inspection steps. Brewster publishes specific instructions for requesting those inspections.
Continue planning
Let’s plan your backup power
Tell us your town, the equipment you want to support and whether you already have a generator. We’ll confirm project scope and availability with you.
Manufacturer and local resources
Planning information checked against these sources on November 23, 2026. Confirm current model details, requirements and project scope before buying equipment.
Generac and its logo are trademarks of Generac Power Systems, Inc. Brand names and artwork identify the equipment discussed. J. Hall Electric is independent; no authorized-dealer status, warranty-service authorization or manufacturer endorsement is claimed. Image and logo credits.

