From backup priorities to a complete proposal
- 01
Choose your priorities
List the systems you want to support during an outage.
- 02
Plan the property
Coordinate location, fuel supply and transfer equipment.
- 03
Agree on the handover
Confirm installation, testing, maintenance and support responsibilities.
Planning overview. Exact equipment and installation requirements depend on the property and selected model.
Identify the town responsible for the property
Martha’s Vineyard comprises Aquinnah, Chilmark, Edgartown, Oak Bluffs, Tisbury and West Tisbury. Start with the relevant town’s building office; there is no single island building-permit office for these six municipalities.
Tisbury publishes building, electrical, plumbing and gas permit resources. Oak Bluffs also provides building and trade applications, with separate Fire Department resources for fuel tanks. These are examples of local pathways, not a substitute for checking the rules governing the actual address.
Resolve fuel and site access early
Provide the existing fuel supplier and tank information, if applicable, along with the proposed generator location and household priorities. Ask who can evaluate the available supply and arrange any necessary work on the island.
Describe the route from the delivery vehicle to the property, including private lanes, gates and shared access. If the address involves Chappaquiddick, identify that in the first inquiry so any additional transport arrangements can be investigated before scheduling.
Plan equipment transport and the return visits
The Steamship Authority has a dedicated freight and commercial-vehicle booking process that asks about cargo and vehicle dimensions. Have the responsible carrier confirm the suitable arrangement for the equipment and vehicle involved.
Include inspections, commissioning and future service in the logistics discussion. A plan for delivering the unit does not settle who will complete the fuel work, attend the handover or return if further work is needed.
Request a feasibility and scope review
Send the town, address, essential-load priorities, fuel details and available site photos or plans. Ask for confirmation of property access, contractor availability and transport before agreeing dates. The proposal should identify electrical and fuel responsibilities, approvals, site work, commissioning and any travel or freight assumptions.
Common questions
Can one town’s approval cover another Vineyard town?
Use the authority responsible for the property. The island has six municipalities, and the relevant reviews must be established for the actual address.
Is island installation availability guaranteed?
No. Availability, access, fuel arrangements, transport and the property’s scope must be confirmed before booking.
What should an off-island owner arrange?
Name a local representative for access, inspections and handover. Agree who will retain records and coordinate ongoing maintenance or fault response.
Continue planning
Let’s plan your backup power
Tell us your town, the equipment you want to support and whether you already have a generator. We’ll confirm project scope and availability with you.
Manufacturer and local resources
Planning information checked against these sources on November 23, 2026. Confirm current model details, requirements and project scope before buying equipment.
Generac and its logo are trademarks of Generac Power Systems, Inc. Brand names and artwork identify the equipment discussed. J. Hall Electric is independent; no authorized-dealer status, warranty-service authorization or manufacturer endorsement is claimed. Image and logo credits.